Closed Systems

 

Closed systems

(FW cooling, heating etc) The Elysator shall be 

mounted as shown in the illustration in a

by-pass position preferably over the main

pumps; a line from the common discharge

of the pumps is connected to the inlet of the

Elysator (bottom). The outlet from the Elysator

(Top) is connected to the common inlet of the

pumps. The inlet/outlet not in use on the

Elysator are to be plugged. The water flow 

needs to be adjusted with the regulating

valve after the flow meter, while the ball valve

on the inlet remains full open. Mild steel pipes

(galvanized pipes are not permitted) with a

diameter not less than 1� should connect

the Elysator to the system. Actual size of pipe

is given for each Type of Elysator. It has 

to be installed as close as possible to the

connection point, and as low as possible in

the system. New buildings/shipyard 

We must strongly underline that the Elysator

does not replace any traditional conservation

liquid, antifreeze or and flushing liquid during the 

building period and start up of the machinery

prior to delivery. It is entirely the shipyard / 

shipbuilders property and responsibility to 

perform this procedure. When all machinery

is prepared to be taken over, the Elysator can 

then be taken into use with �non� chemical water,

and the maintenance to be followed.

 

 

 